Characterize the BOG
Provide gas composition, contaminants, and expected operating envelope.
Match the compressor train to the boil-off gas composition, inlet state, required outlet state, and downstream destination.

In the approved LNG process, the BOG compressor pressurizes gaseous BOG from the storage tank for combustion, pipeline transport, or return to the cold box for reliquefaction.
The described train moves through heating, buffering, inlet filtration, two compression stages, oil separation, high-efficiency oil removal, after-cooling, and process-gas discharge.
These values are from the approved product information and do not mean every gas composition, model, or project covers the full range.
The same BOG label can lead to different process destinations. Selection begins with composition, flow range, inlet state, outlet requirement, and the destination after compression.
Provide gas composition, contaminants, and expected operating envelope.
Provide pressure, temperature, flow range, and storage behavior.
Identify combustion, pipeline transport, or return to the cold box for reliquefaction.
Provide ambient conditions, cooling utilities, power supply, and control requirements.
Share the medium, inlet and outlet conditions, target duty, utilities, and project location. The proposal route starts with verified project inputs.